Publication date: 6 July 2021

Sheila Belayutham, Rabiatul Nurul Akmar Mohamad Jaafar, Herda Balqis Ismail and Che Khairil Izam Che Ibrahim

Megaprojects are typically very expensive public-centred projects that leave little space for any mismanagement or deficient planning, which could affect the project adversely…

Abstract

Purpose

Megaprojects are typically very expensive public-centred projects that leave little space for any mismanagement or deficient planning, which could affect the project adversely. The Last Planner™ System (LPS) is a lean construction planning and control tool that functions to reduce waste and increase performance. Given the benefits, the application of the LPS in megaprojects is still scarce, especially in Malaysia. Hence, this study aims to compare the current production planning, monitoring and review practices in a megaproject with the LPS in order to explore the possibilities of adapting the LPS to the current practices.

Design/methodology/approach

This longitudinal case-based study has first explored the current practices implemented in an infrastructure megaproject, which is an urban rapid transit (URT) project, which was then compared to the standard LPS practices. The case study has adopted several research methods such as observation, interview and document review.

Findings

Findings from the study highlight that the current production planning, monitoring and review practices in the URT project mostly differs from the standard LPS practices with only slight similarities found in the major planning phases. The comparative study, which based on five reference points through master, phase, look-ahead, weekly work plan and measure, and learning has resulted in several key elements, representative of the different planning phases, such as collaborative programming, reverse planning, reliability, dependability and continuous learning.

Practical implications

This study provides an alternative perspective to rail planners, as well as other types of project planners in considering the use of the LPS to enhance the quality of planning, monitoring and review in projects. The framework that highlights the core values and key elements for the related planning phases enables project teams with no lean background to partially adapt their current practices to the LPS with minimal disruption.

Originality/value

This study first contributes to the body of knowledge, where limited study was found comparing and contrasting current production planning practices against the LPS, particularly in rail-based megaproject. The results from the comparison are the key elements representing each of the planning phases that was rooted back to the core values (teamwork, involvement and collaboration, communication and transparency, and continuous improvement) necessary to enhance the current practices.

Details

The TQM Journal, vol. 34 no. 3
Type: Research Article
ISSN: 1754-2731

Keywords

Book part
Publication date: 25 April 2022

Herda Balqis Binti Ismail, Noor Nabilah Binti Sarbini, Hamizah Liyana Binti Tajul Ariffin, Izni Syahrizal Bin Ibrahim and Mohd Fairuz Bin Ab Rahman

The equability of environment, social and economic elements becomes a major issue to be achieved as to attain sustainability in the development of a construction project. As to

Abstract

The equability of environment, social and economic elements becomes a major issue to be achieved as to attain sustainability in the development of a construction project. As to cater to social sustainability, the Guidelines on Occupational Safety and Health in Construction Industry (Management) also known as OSHCIM has been introduced by the government to improve safety practices amongst Malaysia’s construction practitioners. The basic principle adopted in OSHCIM is Prevention through Design (PtD), which enhances the elimination of hazards during project design stages. This concept is inspired from the implementation of Construction (Design and Management) (CDM) Regulations in the United Kingdom. The concept has also been adopted and practised in many developed countries including Australia and Singapore. The aim of this study is to identify the dominant accident causes in Malaysian construction industry. In this study, the secondary data were gathered from the Department of Occupational Safety and Health (DOSH) accident statistics. A content analysis and frequency distribution analysis were adopted to determine causal factors that contribute to the fatality. The findings show the existence of design-related causal factors, which is also incorporated with other causes of accidents. This is true as every accident occurs due to more than one factor. Thus, these inputs will recommend further exploration to determine the design-related causal factors. This may help the industrial players, including stakeholders, practitioners and researchers, to have more focussed efforts and resources in ensuring the success of OSHCIM’s implementation to reduce the accident statistics in Malaysia.

Details

Sustainability Management Strategies and Impact in Developing Countries
Type: Book
ISBN: 978-1-80262-450-2

Keywords

Content available
Book part
Publication date: 25 April 2022

Abstract

Details

Sustainability Management Strategies and Impact in Developing Countries
Type: Book
ISBN: 978-1-80262-450-2

1 – 3 of 3